For project managers looking to establish credibility and drive winning results, author Tom Kendrick's groundbreaking system provides the key to leading cross-functional, outsourced, and other types of teams through every stage of the project cycle.

Results Without Authority is the definitive book on control--teaching the three principal levels of control, including project process, influence, and metrics, among other important areas. You learn the surefire way to keep projects moving forward: by relying only on these factors.

The book's completely updated second edition includes new information on:

  • agile methods and evolving project management tools,
  • strategies for working with virtual teams,
  • analytical versus "blink" decision processes,
  • the use (and misuse) of social media in project environments,
  • and the myth of multitasking.

For project leaders lacking clear-cut authority, getting everyone on board--and keeping them there--can be a challenge. Whether you're managing small, team-level projects or major organizational initiatives, Results Without Authority is the must-have guide to getting the best outcomes for your company.

Frequently asked questions

Simply head over to the account section in settings and click on ā€œCancel Subscriptionā€ - itā€™s as simple as that. After you cancel, your membership will stay active for the remainder of the time youā€™ve paid for. Learn more here.
At the moment all of our mobile-responsive ePub books are available to download via the app. Most of our PDFs are also available to download and we're working on making the final remaining ones downloadable now. Learn more here.
Both plans give you full access to the library and all of Perlegoā€™s features. The only differences are the price and subscription period: With the annual plan youā€™ll save around 30% compared to 12 months on the monthly plan.
We are an online textbook subscription service, where you can get access to an entire online library for less than the price of a single book per month. With over 1 million books across 1000+ topics, weā€™ve got you covered! Learn more here.
Look out for the read-aloud symbol on your next book to see if you can listen to it. The read-aloud tool reads text aloud for you, highlighting the text as it is being read. You can pause it, speed it up and slow it down. Learn more here.
Yes, you can access Results Without Authority by Tom Kendrick in PDF and/or ePUB format, as well as other popular books in Negocios y empresa & Liderazgo. We have over one million books available in our catalogue for you to explore.

Information

Publisher
AMACOM
Year
2012
ISBN
9780814417829
Edition
2
Subtopic
Liderazgo

CHAPTER 1

Control of Projects

PROJECTS ARE EVERYWHERE. Some of these projects succeed; others do not. Many projects fail because the project leader lacks sufficient control to keep things moving toward a successful conclusion. Insufficient project control is a result of many factors: lack of authority, geographically distributed teams, excessive project change, competing priorities, and inadequate planningā€”just to name a few.
Increasingly today, projects are undertaken in environments where the project leader has little formal authority. Even for project managers with formal authority, significant portions of project work are done by contributors who work for other managers, often for a different company. Projects where no one is in charge are almost certain to fail. As the leader of your project, you must assume control, whether or not you possess organizational authority. As unlikely as it may sometimes seem, any project leader can do much to establish and maintain project control. This book has many ideas for achieving project success using techniques that donā€™t depend on organizational position or on formal authority.

image
Whoā€™s in Charge?

In classes, workshops, and informal discussions of project management that Iā€™ve been a part of, one of the most common questions is, ā€œHow can I manage my project if I have no power or authority?ā€ This issue comes up so often that I developed a list of things that project leaders can (and should) take control of, regardless of their position or power in an organization. None of these things requires any authority beyond what is implicit when you are delegated responsibility for a project, and some donā€™t even rely on that.
Factors That Any Project Leader Can Control
ā€¢ Measurement
ā€¢ Reporting cycles
ā€¢ Milestones
ā€¢ Communication
ā€¢ Project reviews
ā€¢ Change management
ā€¢ Rewards and recognition
ā€¢ Constructive criticism
ā€¢ Reciprocity and exchange
ā€¢ Risk monitoring
Project leaders can use these means, along with many others in this book, to enhance their control in any project environment. Because the techniques outlined in the next several chapters donā€™t rely on the command-and-control authority of the project leader, they are effective in cross-functional, agile, matrix, heavily outsourced, virtual, volunteer, and other challenging environments. In fact, even project managers with substantial authority will benefit from the practices described in this book because they avoid the potential resentment and demotivation that can result from pulling rank.

image
Structure of This Book

The first half of this book explores three elements of project control: process, influence, and measurement. This introductory chapter introduces these elements, and Chapters 2ā€“4 dig into the details and show how to apply them in your project environment.
The second half of the book examines when to use these three elements for control throughout the life of a typical project. The Guide to the Project Management Body of Knowledge (PMBOKĀ® Guide), from the Project Management Institute, identifies five process groups: initiating, planning, executing, monitoring and controlling, and closing. Chapters 5ā€“9 map these topics, describing how to better control your project from its beginning to its end. Where the PMBOK Guide tends to assume that a project manager has formal power, the discussion throughout this book focuses on controlling project work even when you do not have such direct authority.
Each chapter begins by outlining the principal concepts for that chapter, then explores each idea in detail using examples. Each of Chapters 2ā€“9 concludes with a summary of key ideas, and Chapter 10 summarizes the fundamental ideas of the book and offers some final thoughts on applying them to your projects.
This book contains many ideasā€”far more than any single project would ever need. The advice ranges from tips useful on small projects to ideas for dealing with the complexity of large, multiteam programs. Read through the book using your own judgment to determine which ideas are the most effective and helpful for your specific situation. To get started, pick an idea or two from each section that you think will help you with your project. When you encounter a problem, use the table of contents to locate pointers to deal with it, and adapt the practices outlined there to move things back under control. Donā€™t overcomplicate your project with processes that arenā€™t needed; if two approaches to a project issue are equally effective, always choose the simpler one.

image
Elements of Project Control

Every project leader has a number of levers available that increase project control. Three principal elements of control are:
1. Project processes
2. Influence
3. Metrics (measurement)
Project processes provide the structure necessary for control and can serve as an effective substitute for organizational authority. You can build influence in many ways, and the more you are able to sway, encourage, or win over those you are working with, the better you will be able to control your project. Measurement quantifies results and drives behavior, so metrics are useful for both understanding the status of your project and encouraging cooperation. With these three techniques, you can control and be successful with any type of project.

Project Processes

Some years ago, a good friend celebrated a fiftieth birthday at a bowling alley with about a hundred friends. (Names are withheld to shield the guilty.) Because most of us in attendance were of roughly the same age and few had bowled more than once in the previous three decades, the initial frames we bowled were spectacularly pathetic. In the intervening years, the gutters on either side of the lanes seemed to have developed an almost magnetic attraction for bowling balls. Some people were halfway through their initial game and still trying to knock down their first pin.
Fortunately, the alleys had bumpers on either side, which we soon flipped into position on almost all of our lanes. These bumpers ran the length of the lane over the gutters, so balls that would have otherwise fallen out of play were bounced back onto the lane. With more balls rolling toward the pins (if not exactly in the center of the alleys), scores improved dramatically.
Good processes for projects are analogous to bumpers in bowling. Well-defined processes, properly applied, keep projects from rolling off into the gutter. Project processes are a source of substantial control, and they are usually owned by project leaders because much of the work is their personal responsibility.
Early in a new project, a project leader can easily influence even project processes that others own as they are being established. Most people can recall the unpleasant results caused on projects that lacked sufficiently defined processes. Your team members, stakeholders, managers, and sponsors are all likely to agree to process discipline that addresses past problems and inefficiencies. When initiating your overall project infrastructure, work to define all processes affecting your project team, and to get them accepted by everyone in advance.
Processes permeate the project life cycle. Some are related to specific phases of project work, such as those for requirements definition, scope freeze, baseline planning, risk identification, and project review. Other processes apply throughout a project, such as those for communication and change management. Whatever their timing, clearly defined processes are bumpers that enable the project leader to keep the ball rolling toward the final objective. Project processes are the main topic of Chapter 2.

Influence

In projects, as in most situations, people tend to work on the things that they want to work on. Even when a leaderā€™s authority is absolute, ordering people to do something doesnā€™t make them want to do it. Using command-and-control authority to force people to do things unwillingly leads to resentment and demotivation. Malicious compliance is also a risk; people may find ways to appear to cooperate while actually harming the project. In extreme cases, some people will fail to do as they are asked even when the personal consequences of non-compliance are severe. If generals and admirals cannot always expect automatic obedience, what chance does a project leader have?
Nevertheless, as project leader, you have a fairly good chance of gaining support if you use the correct approach. Getting cooperation is much easier when you have a two-way relationship of trust and respect with your team members. Effective project leaders create this essential foundation for influence through team-building activities, formal group events (such as project start-up workshops), and informal one-on-one interactions. The surest path to cooperation starts with establishing strong social relationships in which people donā€™t want to disappoint each other.
Another way to enlist willing cooperation is to involve your project staff in activities that they want to work on. When a team member is enthusiastic about the project work, thereā€™s no trick to it; the project leader has little more to do than assign ownership and stay out of the way. When project work does not appeal to the members of your project team, however, you must work to create interest in it. The principal technique begins with an understanding that everyoneā€™s favorite call letters are WIIFM: Whatā€™s in it for me? Leaders in any field invest the time to understand what the people they are working with really care about. Effective project leaders identify opportunities to align the projectā€™s needs with what the individuals want to do, and they assign responsibility for project activities accordingly. The tools of influence rely on reciprocity ā€”an exchange of something that the individual wants for the commitment to complete work that the project requires.
Another key to influence is effective communication. Either project leaders are good communicators, or they are not project leaders for long. Communication is the one absolutely undisputed responsibility owned by the project leader, regardless of project type, other responsibilities, or authority. To succeed and retain control, you must manage information and always communicate effectively.
Formal project communication includes written documentation for your project, such as plans and progress reports. Using the power of your pen, you can control your project through filtering and summarizing and by deciding how best to distribute information and when.
Informal communication is also an essential component of project control. Influence and relationship building depend on frequent conversations and other casual interactions. Often you will learn about project problems much earlier through informal discussions than from formally collected project status. The earlier you can detect problems, the more options you have. Control depends on the quick resolution of issues and problems. You can also influence others by asking revealing (and sometimes embarrassing) questions. When your authority is insufficient to avoid situations that could harm your project, asking a pointed question or two at the right time can have the same effect. Your perspective as the project leaderā€”understanding the work, the capacities of your team, and the projectā€™s prioritiesā€”enables you to guide people to rational conclusions that are consistent with project success.
Establishing and using influence for project control is explored in detail in Chapter 3.

Metrics

Control in any environment relies on measurements. Without clearly defined limits, the very concept of control lacks meaning. In addition to the obvious role of metrics in determining overall project performance, metrics also affect the behavior of the project team. As Bill Hewlett, founder of the Hewlett-Packard Company, is reputed to have said, ā€œWhat gets measured gets done.ā€ Measuring a few key things on a project and publishing the results powerfully affect your projectā€™s progress.
A small set of well-defined project metrics gives the project leader a powerful tool for managing project initiation, execution, and closure. Effectively using project measurement for project control is the topic of Chapter 4.

image
No One Ever Said That Projects Are Easy

One analogy I like to use is that running a project is like driving a vehicle down a steep hill. Control of a moving vehicle involves the use of the steering wheel, the accelerator, and the brake. Having all three is nice. With projects, however, someone elseā€™s foot is on the accelerator, and, if you brake, you will be late. You do have both hands on the steering wheel, though. So you steer with process, influence, and metrics, keeping your trajectory as true as you can. With adequate preparation, diligence, and attention to detail, you can reach your destination, exhausted but exhilarated, with no casualties and only a few scratches, dings, and minor dents here and there. Project control starts at project initiation, and it requires your full attention all the way to the end. Applying the concepts you find in this book will carry you safely to your destination: project success.

CHAPTER 2

Control Through Process

MOST MODERN PROJECTS ARE DIFFICULT. Lacking effective project management processes, most projects fall into certain chaos. Projects undertaken using practical methods have a much better chance of success, especially when the project leader has little formal authority.
The foundation of effective project management has been establis...

Table of contents

  1. Cover Page
  2. Title Page
  3. Copyright Page
  4. Contents
  5. Acknowledgments
  6. 1. Control of Projects
  7. 2. Control Through Process
  8. 3. Control Through Influence
  9. 4. Control Through Project Metrics
  10. 5. Control Begins with Project Initiation
  11. 6. Building Control Through Project Planning
  12. 7. Maintaining Control During Project Execution
  13. 8. Tracking and Monitoring for Project Control
  14. 9. Enhancing Overall Control Through Project Closure
  15. 10. Conclusion
  16. Appendix A: Example Project Infrastructure Decisions
  17. Appendix B: Selected References
  18. Index