This book defines, develops, and examines the foundations of the APQP (Advanced Product Quality Planning) methodology. It explains in detail the five phases, and it relates its significance to national, international, and customer specific standards. It also includes additional information on the PPAP (Production Part Approval Process), Risk, Warranty, GD&T (Geometric Dimensioning and Tolerancing), and the role of leadership as they apply to the continual improvement process of any organization.

Features



  • Defines and explains the five stages of APQP in detail
  • Identifies and zeroes in on the critical steps of the APQP methodology
  • Covers the issue of risk as it is defined in the ISO 9001, IATF 16949, the pending VDA, and the OEM requirements
  • Presents the role of leadership and management in the APQP methodology
  • Summarizes all of the change requirements of the IATF standard

Häufig gestellte Fragen

Wie kann ich mein Abo kündigen?
Gehe einfach zum Kontobereich in den Einstellungen und klicke auf „Abo kündigen“ – ganz einfach. Nachdem du gekündigt hast, bleibt deine Mitgliedschaft für den verbleibenden Abozeitraum, den du bereits bezahlt hast, aktiv. Mehr Informationen hier.
(Wie) Kann ich Bücher herunterladen?
Derzeit stehen all unsere auf Mobilgeräte reagierenden ePub-Bücher zum Download über die App zur Verfügung. Die meisten unserer PDFs stehen ebenfalls zum Download bereit; wir arbeiten daran, auch die übrigen PDFs zum Download anzubieten, bei denen dies aktuell noch nicht möglich ist. Weitere Informationen hier.
Welcher Unterschied besteht bei den Preisen zwischen den Aboplänen?
Mit beiden Aboplänen erhältst du vollen Zugang zur Bibliothek und allen Funktionen von Perlego. Die einzigen Unterschiede bestehen im Preis und dem Abozeitraum: Mit dem Jahresabo sparst du auf 12 Monate gerechnet im Vergleich zum Monatsabo rund 30 %.
Was ist Perlego?
Wir sind ein Online-Abodienst für Lehrbücher, bei dem du für weniger als den Preis eines einzelnen Buches pro Monat Zugang zu einer ganzen Online-Bibliothek erhältst. Mit über 1 Million Büchern zu über 1.000 verschiedenen Themen haben wir bestimmt alles, was du brauchst! Weitere Informationen hier.
Unterstützt Perlego Text-zu-Sprache?
Achte auf das Symbol zum Vorlesen in deinem nächsten Buch, um zu sehen, ob du es dir auch anhören kannst. Bei diesem Tool wird dir Text laut vorgelesen, wobei der Text beim Vorlesen auch grafisch hervorgehoben wird. Du kannst das Vorlesen jederzeit anhalten, beschleunigen und verlangsamen. Weitere Informationen hier.
Ist Advanced Product Quality Planning als Online-PDF/ePub verfügbar?
Ja, du hast Zugang zu Advanced Product Quality Planning von D. H. Stamatis im PDF- und/oder ePub-Format sowie zu anderen beliebten Büchern aus Technology & Engineering & Industrial Engineering. Aus unserem Katalog stehen dir über 1 Million Bücher zur Verfügung.

Information

Verlag
CRC Press
Jahr
2018
ISBN
9780429684593
section one
The APQP process
chapter one
Plan and define
Image
Perhaps one of the most important responsibilities of the entire advanced product quality planning (APQP) process is the plan and define stage. The essential responsibilities are:
Sourcing decision (SD)
In its most inherent responsibility it is “the” process that the customer uses to evaluate the supplier for future business. It serves as a formal customer commitment to work with all internal and external part suppliers, tooling suppliers, and facility suppliers on a program. Another way to describe it is that the SD is a coordinated effort between customers and suppliers for a “best fit” relationship to produce and accept the required product.
A critical evaluation of the potential supplier may be a source evaluation including a physical visit to the supplier’s facility. A typical source evaluation has five components. They are:
1. Identification: Here the following items are considered and evaluated: (a) review list of possible suppliers; (b) analyze suppliers with existing ratings or evaluations—sometimes this analysis is based on surrogate data; (c) screen supplier pre-evaluation data; and (d) determine strategic suppliers needing evaluations.
2. Task clarification: Here the following items are considered and evaluated: (a) clarify scope of tasks related to product, site, and technology and supplier performance data, which may be from past experience with the supplier and or surrogate data from similar products; and (b) prepare decision-making recommendation and obtain management approval for the task.
3. Visit preparation: Here the following items are considered and evaluated: (a) form the cross-functional and multidiscipline team, (b) hold kickoff meeting and assign roles and responsibilities, (c) preliminary discussion of supplier pre-evaluation package, and (d) schedule on-site visit and confirm trip details.
4. On-site visit: Here the following items are considered and evaluated: (a) perform on-site evaluation, (b) inspect facility, (c) collate and coordinate analysis results and scoring, and (d) conduct closing meeting with supplier with verbal feedback of major findings (good and bad observations).
5. Initial risk evaluation (IRE): Perhaps one of the most overlooked items in the planning phase is an IRE. But what is an IRE? In the simplest form it is an upfront evaluation (assessment) of the inherent risks in a new or modified part. This assessment may include: (a) historical performance (quality, capability, capacity, delivery, costs, safety, and manpower) availability; (b) available dedicated facilities; and (c) financial stability. (Here we must mention that the customer—depending on the status of the supplier—may require more than one IRE during the course of the program).
So, what are some of the key risk drivers that should be assessed? Typical items of concern are summarized in Table 1.1.
6. Results and reporting: Here the following items are considered and evaluated: (a) finalize summary report and defined criteria, (b) calculate the evaluation’s pass/fail rating and identify any risk factors, (c) report to approved managers, and (d) upload the information to the electronic system—if there is one.
At the end of this evaluation the key expectations are:
• All internal and external suppliers for a program are identified.
• Early sourcing target agreements are established and signed by appropriate areas.
• All nonspecific customer requirement (e.g., Q1 3rd ed.) suppliers are identified.
• Special arrangements for nonspecific customer requirement suppliers are identified.
• A program timeline, aligned to the organization’s timing, is established from Strategic Intent to Job1.
• A risk assessment has been completed for all high-impact items.
Table 1.1 Typical items of concern in an IRE
Typical risk drivers
Y/N
Expectations
Guidelines
Are there issues preventing completion of tasks by required date?
A common acceptable scoring is a range of 60–80 and for safety items a range of 70–90.
If color is used for evaluating risk the following is recommended: RED: Cannot bid/source business unless a customer director or higher signs off.
YELLOW: Requires customer’s senior manager signature for bid approval or sourcing business.
GREEN: OK to bid or source business.
Review the planned completion dates for the tasks identified. Remember that the production tooling is complete by the verification of process time milestone.
Since tooling completion affects many APQP deliverables, it is imperative that it be monitored very closely. Late tooling should equate to a high completion after pre-volume production (PVP) and, if possible, it should be an automatic activity.
Will the production part approval process (PPAP) be completed by the required date?
Review the planned PPAP date. In the review you want to evaluate capacity projections.
If PPAP is not expected to be completed on time, a higher risk level is warranted. If engineering changes are the reason for the projected delay then the PPAP submission Delay (some call it: alarm; Request for Eng. Change and so on).
Is the design complete?
The part design/CAD should be complete and attached as part of the original source package.
If the supplier submitted a request for quote (RFQ) to an incomplete or non-existent part there is increased risk to the program. Tooling kickoff (TKO) without a complete design is also a high risk to the program.
Has historical design stability been considered?
Review lessons learned (both TGW and TGR) from previous or surrogate programs. Focus on the timing of engineering changes and whether they were minor or major in scope.
A high incidence of change notifications or one major or more than one minor change should reflect a higher risk level.
What is the customer impact if the part fails (in any way, or more specifically on issues of safety, application, functionality, etc.)?
Determine the potential customer impact if the part has failed in the past or it fails under the new conditions. Avoidance of any customer perception issues/problems must be a priority.
Parts with a high degree of customer interface should have been identified as high-risk items. Typical items here may be: safety components, appearance requirements for high visibility areas, etc.
What is the level of the process technology? Is it old? Widespread? Innovative?
Review the proposed manufacturing process. Make sure all functions are accounted for.
Processes that are using new technologies for the supplier require higher risk levels.
Is this a new manufacturing location (Greenfield)?
Manufacturing locations new to a customer must be evaluated and an acceptable score must be attained. All open issues—if there are any—must be closed. In case of any items being open, they must have appropriate overrides and authorization.
A new supplier to a particular customer represents a higher risk to the program since there is no direct history with that supplier, so the designated risk should be higher than for a supplier with some history (Brownfield).
Have there been historical quality problems with similar parts?
All historical quality characteristics in reference to a part—if applicable—or surrogate parts must be reviewed and evaluated to ensure these issues have been addressed so that they are not repeated.
Any high incidence for any key characteristic for a particular part represents a higher risk. Repeated issues or lack of corrective actions on any pending issue must be identified as a high-risk part or program.
What is the supplier’s pre-assessment scoring method and what are the criteria for success, i.e., Q1 3rd ed. (Ford), Supplier Quality Bid List (SQBL; Fiat Chrysler)? Is there some form of specific score card for the supplier in addition to quality, cost, delivery, performance, risk? Or any other ...

Inhaltsverzeichnis

  1. Cover
  2. Half Title
  3. Title Page
  4. Copyright Page
  5. Table of Contents
  6. List of acronyms
  7. Preface
  8. Author
  9. Introduction
  10. Section I: The APQP process
  11. Section II: Selected specific issues concerning APQP
  12. Appendix A: Leadership of top management
  13. Appendix B: IATF 16949
  14. Appendix C: FMEA forms
  15. Appendix D: Failure mode avoidance (FMA)
  16. References
Zitierstile für Advanced Product Quality Planning

APA 6 Citation

Stamatis, D. (2018). Advanced Product Quality Planning (1st ed.). CRC Press. Retrieved from https://www.perlego.com/book/1514134/advanced-product-quality-planning-the-road-to-success-pdf (Original work published 2018)

Chicago Citation

Stamatis, D. (2018) 2018. Advanced Product Quality Planning. 1st ed. CRC Press. https://www.perlego.com/book/1514134/advanced-product-quality-planning-the-road-to-success-pdf.

Harvard Citation

Stamatis, D. (2018) Advanced Product Quality Planning. 1st edn. CRC Press. Available at: https://www.perlego.com/book/1514134/advanced-product-quality-planning-the-road-to-success-pdf (Accessed: 14 October 2022).

MLA 7 Citation

Stamatis, D. Advanced Product Quality Planning. 1st ed. CRC Press, 2018. Web. 14 Oct. 2022.