Engineering surveying involves determining the position of natural and man-made features on or beneath the Earth's surface and utilizing these features in the planning, design and construction of works. It is a critical part of any engineering project. Without an accurate understanding of the size, shape and nature of the site the project risks expensive and time-consuming errors or even catastrophic failure.

This fully updated sixth edition of Engineering Surveying covers all the basic principles and practice of the fundamentals such as vertical control, distance, angles and position right through to the most modern technologies.

It includes:

* An introduction to geodesy to facilitate greater understanding of satellite systems

* A fully updated chapter on GPS, GLONASS and GALILEO for satellite positioning in surveying

* All new chapter on the important subject of rigorous estimation of control coordinates

* Detailed material on mass data methods of photogrammetry and laser scanning and the role of inertial technology in them

With many worked examples and illustrations of tools and techniques, it suits students and professionals alike involved in surveying, civil, structural and mining engineering, and related areas such as geography and mapping.

Frequently asked questions

Simply head over to the account section in settings and click on “Cancel Subscription” - it’s as simple as that. After you cancel, your membership will stay active for the remainder of the time you’ve paid for. Learn more here.
At the moment all of our mobile-responsive ePub books are available to download via the app. Most of our PDFs are also available to download and we're working on making the final remaining ones downloadable now. Learn more here.
Both plans give you full access to the library and all of Perlego’s features. The only differences are the price and subscription period: With the annual plan you’ll save around 30% compared to 12 months on the monthly plan.
We are an online textbook subscription service, where you can get access to an entire online library for less than the price of a single book per month. With over 1 million books across 1000+ topics, we’ve got you covered! Learn more here.
Look out for the read-aloud symbol on your next book to see if you can listen to it. The read-aloud tool reads text aloud for you, highlighting the text as it is being read. You can pause it, speed it up and slow it down. Learn more here.
Yes, you can access Engineering Surveying by W Schofield, Mark Breach in PDF and/or ePUB format, as well as other popular books in Technology & Engineering & Construction & Architectural Engineering. We have over one million books available in our catalogue for you to explore.

1

Basic concepts of surveying

The aim of this chapter is to introduce the reader to the basic concepts of surveying. It is therefore the most important chapter and worthy of careful study and consideration.

1.1 DEFINITION

Surveying may be defined as the science of determining the position, in three dimensions, of natural and man-made features on or beneath the surface of the Earth. These features may be represented in analogue form as a contoured map, plan or chart, or in digital form such as a digital ground model (DGM).
In engineering surveying, either or both of the above formats may be used for planning, design and construction of works, both on the surface and underground. At a later stage, surveying techniques are used for dimensional control or setting out of designed constructional elements and also for monitoring deformation movements.
In the first instance, surveying requires management and decision making in deciding the appropriate methods and instrumentation required to complete the task satisfactorily to the specified accuracy and within the time limits available. This initial process can only be properly executed after very careful and detailed reconnaissance of the area to be surveyed.
When the above logistics are complete, the field work – involving the capture and storage of field data – is carried out using instruments and techniques appropriate to the task in hand.
Processing the data is the next step in the operation. The majority, if not all, of the computation will be carried out with computing aids ranging from pocket calculator to personal computer. The methods adopted will depend upon the size and precision of the survey and the manner of its recording; whether in a field book or a data logger. Data representation in analogue or digital form may now be carried out by conventional cartographic plotting or through a totally automated computer-based system leading to a paper- or screen-based plot. In engineering, the plan or DGM is used when planning and designing a construction project. The project may be a railway, highway, dam, bridge, or even a new town complex. No matter what the work is, or how complicated, it must be set out on the ground in its correct place and to its correct dimensions, within the tolerances specified. To this end, surveying procedures and instrumentation of varying precision and complexity are used depending on the project in hand.
Surveying is indispensable to the engineer when planning, designing and constructing a project, so all engineers should have a thorough understanding of the limits of accuracy possible in the construction and manufacturing processes. This knowledge, combined with an equal understanding of the limits and capabilities of surveying instrumentation and techniques, will enable the engineer to complete the project successfully in the most economical manner and in the shortest possible time.

1.2 PRINCIPLES

Every profession must be founded upon sound practice and in this engineering surveying is no different. Practice in turn must be based upon proven principles. This section is concerned with examining the principles of survey, describing their interrelationship and showing how they may be applied in practice. Most of the principles below have an application at all stages of a survey and it is an unwise and unprofessional surveyor who does not take them into consideration when planning, executing, computing and presenting the results of the survey work. The principles described here have application across the whole spectrum of survey activity, from field work to photogrammetry, mining surveying to metrology, hydrography to cartography, and cadastral to construction surveying.

1.2.1 Control

A control network is the framework of survey stations whose coordinates have been precisely determined and are often considered definitive. The stations are the reference monuments, to which other survey work of a lesser quality is related. By its nature, a control survey needs to be precise, complete and reliable and it must be possible to show that these qualities have been achieved. This is done by using equipment of proven precision, with methods that satisfy the principles and data processing that not only computes the correct values but gives numerical measures of their precision and reliability.
Since care needs to be taken over the provision of control, then it must be planned to ensure that it achieves the numerically stated objectives of precision and reliability. It must also be complete as it will be needed for all related and dependent survey work. Other survey works that may use the control will usually be less precise but of greater quantity. Examples are setting out for earthworks on a construction site, detail surveys of a greenfield site or of an as-built development and monitoring many points on a structure suspected of undergoing deformation.
The practice of using a control framework as a basis for further survey operations is often called ‘working from the whole to the part’. If it becomes necessary to work outside the control framework then it must be extended to cover the increased area of operations. Failure to do so will degrade the accuracy of later survey work even if the quality of survey observations is maintained.
For operations other than setting out, it is not strictly necessary to observe the control before other survey work. The observations may be concurrent or even consecutive. However, the control survey must be fully computed before any other work is made to depend upon it.

1.2.2 Economy of accuracy

Surveys are only ever undertaken for a specific purpose and so should be as accurate as they need to be, but not more accurate. In spite of modern equipment, automated systems, and statistical data processing the business of survey is still a manpower intensive one and needs to be kept to an economic minimum. Once the requirement for a survey or some setting out exists, then part of the specification for the work must include a statement of the relative and absolute accuracies to be achieved. From this, a specification for the control survey may be derived and once this specification has been achieved, there is no requirement for further work.
Whereas control involves working from ‘the whole to the part’ the specification for all survey products is achieved by working from ‘the part to the whole’. The specification for the control may be derived from estimation based upon experience using knowledge of survey methods to be applied, the instruments to be used and the capabilities of the personnel involved. Such a specification defines the expected quality of the output by defining the quality of the work that goes into the survey. Alternatively a statistical analysis of the proposed control network may be used and this is the preferable approach. In practice a good specification will involve a combination of both methods, statistics tempered by experience. The accuracy of any survey work will never be better than the control upon which it is based. You cannot set out steelwork to 5 mm if the control is only good to 2 cm.

1.2.3 Consistency

Any ‘product’ is only as good as the most poorly executed part of it. It matters not whether that ‘product’ is a washing machine or open heart surgery, a weakness or inconsistency in the endeavour could cause a catastrophic failure. The same may apply in survey, especially with control. For example, say the majority of control on a construction site is established to a certain designed precision. Later one or two further control points are less well established, but all the control is assumed to be of the same quality. When holding-down bolts for a steelwork fabrication are set out from the erroneous control it may require a good nudge from a JCB to make the later stages of the steelwork fit.
Such is the traditional view of consistency. Modern methods of survey network adjustment allow for some flexibility in the application of the principle and it is not always necessary for all of a particular stage of a survey to be of the same quality. If error statistics for the computed control are not to be made available, then quality can only be assured by consistency in observational technique and method. Such a quality assurance is therefore only second hand. With positional error statistics the quality of the control may be assessed point by point. Only least squares adjustments can ensure consistency and then only if reliability is also assured. Consistency and economy of accuracy usually go hand in hand in the production of control.

1.2.4 The Independent check

The independent check is a technique of quality assurance. It is a means of guarding against a blunder or gross error and the principle must be applied at all stages of a survey. Failure to do so will lead to the risk, if not probability, of ‘catastrophic failure’ of the survey work. If observations are made with optical or mechanical instruments, then the observations will need to be written down. A standard format should be used, with sufficient arithmetic checks upon the booking sheet to ensure that there are no computational errors. The observations should be repeated, or better, made in a different manner to ensure that they are in sympathy with each other. For example, if a rectangular building is to be set out, then once the four corners have been set out, opposite sides should be the same length and so should the diagonals. The sides and diagonals should also be related through Pythagoras’ theorem. Such checks and many others will be familiar to the practising surveyor.
Checks should be applied to ensure that stations have been properly occupied and the observations between them properly made. This may be achieved by taking extra and different measurements beyond the strict minimum required to solve the survey problem. An adjustment of these observations, especially by least squares, leads to misclosure or error statistics, which in themselves are a manifestation of the independent check....

Table of contents

  1. Front Cover
  2. Half Title
  3. Title Page
  4. Copyright
  5. Contents
  6. Wilf Schofield 1933–2006
  7. Preface to the sixth edition
  8. Preface to the fifth edition
  9. Acknowledgements
  10. 1 Basic concepts of surveying
  11. 2 Error and uncertainty
  12. 3 Vertical control
  13. 4 Distance measurement
  14. 5 Angle measurement
  15. 6 Conventional control surveys
  16. 7 Rigorous methods of control
  17. 8 Position
  18. 9 Satellite positioning
  19. 10 Curves
  20. 11 Earthworks
  21. 12 Setting out (dimensional control)
  22. 13 Underground surveying
  23. 14 Mass data methods
  24. Appendix A An introduction to matrix algebra