About This Book

This reference provides reliable piping estimating data including installation of pneumatic mechanical instrumentation used in monitoring various process systems. This new edition has been expanded and updated to include installation of pneumatic mechanical instrumentation, which is used in monitoring various process systems.

Frequently asked questions

Simply head over to the account section in settings and click on “Cancel Subscription” - it’s as simple as that. After you cancel, your membership will stay active for the remainder of the time you’ve paid for. Learn more here.
At the moment all of our mobile-responsive ePub books are available to download via the app. Most of our PDFs are also available to download and we're working on making the final remaining ones downloadable now. Learn more here.
Both plans give you full access to the library and all of Perlego’s features. The only differences are the price and subscription period: With the annual plan you’ll save around 30% compared to 12 months on the monthly plan.
We are an online textbook subscription service, where you can get access to an entire online library for less than the price of a single book per month. With over 1 million books across 1000+ topics, we’ve got you covered! Learn more here.
Look out for the read-aloud symbol on your next book to see if you can listen to it. The read-aloud tool reads text aloud for you, highlighting the text as it is being read. You can pause it, speed it up and slow it down. Learn more here.
Yes, you can access Estimator's Piping Man-Hour Manual by John S. Page in PDF and/or ePUB format, as well as other popular books in Personal Development & Time Management. We have over one million books available in our catalogue for you to explore.

Information

Year
1999
ISBN
9780080506005
Section Two FIELD FABRICATION AND ERECTION
This section is intended to suffice for the complete labor involved in the installation and field fabrication as may be necessary to put a system of process piping into operation in an industrial or chemical plant.
The man hours listed are for labor only and do not have any bearing on materials or equipment.
All labor for unloading from railroad cars or trucks hauling to and unloading at storage facilities, hauling from storage to erection site and rigging or hoisting into place have been given due consideration in the man hours listed for the various operations. While it is true that the aforementioned operations involve more time than is required merely to haul materials from and on the job, fabricating shop or storage area, nevertheless, we have found that these are operations that will balance themselves out over a complete piping job. No consideration has been given to overhead or profit.
For the field fabrication and erection of alloy and non - ferrous piping and fittings, apply the percentages which appear under Section Three to the following pages listing the various field operations.

HANDLING AND ERECTING STRAIGHT RUN PIPE

DIRECT MAN HOURS — PER FOOT
image
Man hours include all labor for unloading and storing in yard, loading and hauling to erection site, and rigging and aligning in place. It does not include welding, bolt-ups, make-ons or scaffolding. See respective pages for these items.
For brass, copper, and everdur pipe, double above man hours.

HANDLING AND ERECTING HEAVY WALL STRAIGHT RUN PIPE

Carbon Steel Material
NET MAN HOURS PER FOOT
image
Man hours include all labor for unloading and storing in yard, loading and hauling to erection site, and rigging and aligning in place.
Man hours do not include welding, bolt-ups, make-ons or scaffolding. See respective tables for these items.

HANDLING AND ERECTING LARGE O.D. STRAIGHT RUN PIPE

Carbon Steel Material
NET MAN HOURS PER FOOT
image
Man hours include all labor for unloading and storing in yard, loading and hauling to erection site, and rigging and aligning in place.
Man hours do not include welding, bolt-ups. make-ons or scaffolding. See respective tables for these items.

HANDLING AND ERECTING FABRICATED SPOOL PIEC...

Table of contents

  1. Cover Image
  2. Title page
  3. Man-Hour Manuals and Other Books by John S. Page
  4. Copyright
  5. PREFACE
  6. INTRODUCTION: Production and Composite Rate
  7. Table of Contents
  8. Section One: SHOP FABRICATION OF PIPE AND FITTINGS
  9. Section Two: FIELD FABRICATION AND ERECTION
  10. Section Three: ALLOY AND NON-FERROUS FABRICATION
  11. Section Four: PNEUMATIC MECHANICAL INSTRUMENTATION
  12. Section Five: UNDERGROUND PIPING
  13. Section Six: HANGERS AND SUPPORTS
  14. Section Seven: PAINTING
  15. Section Eight: PATENT SCAFFOLDING
  16. Section nine: INSULATION
  17. Section Ten: SAMPLE ESTIMATE
  18. Section Eleven: TECHNICAL INFORMATION